Context and business need
As Getir moved from rapid expansion towards a greater focus on profitability, labour planning needed to control costs while maintaining operational performance. Store Assistants in this case are the store teams involved in preparing orders. This case describes my work within Getir, not an independent consulting-client project.

My contribution
I analysed store performance data, examined differences between locations and helped translate those findings into Store Assistant capacity planning. I worked with order volume, Picking Time and Missing Order indicators to understand workload and performance differences.
From analysis to planning
Demand intensity and shift needs informed the development of a new capacity model and resource-use standards. Field tests and performance comparisons helped assess whether the assumptions were workable in the operation. Labour cost was considered alongside preparation speed and service quality.
Concrete outputs
Location-level KPI comparisons across the 96-store scope; a Store Assistant capacity model; a planning approach assessed through field testing; and resource-use standards that provided a common framework while recognising local differences.
What the figures mean
The 96 locations describe the scale of the work. They are not an improvement percentage. This case does not publish a verified savings amount or performance uplift with a comparable baseline and period.
What another business can learn
Start by connecting workload, capacity, quality and cost. A planning model should support a specific operational decision and be checked in the setting where it will be used. The method needs to be adapted to the business’s own data and constraints.
Related support
Operational efficiency consulting can cover workload-capacity comparison, process mapping, KPI definitions and a practical pilot plan. For delivery capacity rather than order preparation, see the courier planning case.
Apply the lesson to your own operation
If workload differs between locations, compare volume, task time and service quality before applying a shared staffing assumption. Use the operational efficiency assessment template to plan one bounded pilot, review the consulting deliverables, or discuss the process you want to improve.
Planning outputs and the decisions they supported
| Output | Content | Decision |
|---|---|---|
| Location-level comparison | Order volume, Picking Time and Missing Order across the 96-store scope | Which locations need closer workload and resource review? |
| Store Assistant capacity model | Order intensity and operating requirements related to team capacity | How should capacity reflect local demand? |
| Field-tested planning approach | Assessment under actual operating conditions | Are the planning assumptions workable on site? |
| Resource-use standards | A shared review framework recognising location differences | How can planning remain consistent without treating every store as identical? |
Operational context and measures
The business was moving from rapid expansion towards profitability. Rising Store Assistant costs, different store productivity and non-standard planning made a consistent model important. Different order volumes, shift needs and service requirements meant one identical allocation could not simply be imposed everywhere. Picking Time describes order preparation speed; Missing Order and service measures provide a quality check alongside volume and resource use.
Store planning questions
What was Yaşar Yılmaz’s contribution?
I analysed store KPIs and location differences, worked on the Store Assistant capacity model and resource standards, and connected the approach to field tests.
How is this different from courier planning?
Store Assistant planning concerns in-store order preparation. Courier planning concerns delivery capacity and the hourly distribution of order demand.
Operating scope
96
Dark stores
UK
Operating scope
KPI-led
Workforce planning
Data-led
Decision-making
These describe the scope or reported context of the work. They are not a percentage improvement or a guarantee for another business.
Let’s discuss your priorities
Share your business, market and main challenge. We can clarify the need and an appropriate scope of work.
Discuss your business →